Verification Projects

  Project Title UN Project Activity Number Monitoring Period Host Country Methodology Issuance date Monitoring Report Validation,
Verification
&
Certification
Reports

CCL33

EnviroServ Chloorkop Landfill Gas Recovery Project 0925 (MP 3) 01/01/2010 – 01/03/2012

03/01/2013

(MP 4) 01/04/2012 – 31/12/2012

South Africa
AM0011 ver. 2 - Landfill gas recovery with electricity generation and no capture or destruction of methane in the baseline scenario


AM0011 ver. 2
- Landfill gas recovery with electricity generation and no capture or destruction of methane in the baseline scenario - Sectoral Scope 13

...






...

CCL112

Trueno River Hydroelectric Power Plant  4337 12/1/2011 – 31/12/2011 Chile AMS-I.D. ver. 15 - Grid connected renewable electricity generation ...

CCL135

Tugela Mill Fuel Switching Project 0795 01/03/2009 – 31/03/2012
South Africa
AMS-I.C. – “Thermal Energy for the User” Version 8 - Sectoral Scope 01 ...

CCL142

The Capture and Utilisation of Methane at the GFI Mining South Africa owned Beatrix Mine in South Africa 4728 01/07/2011 – 31/03/2012
South Africa
AM0064 ver. 2 - Methodology for methane capture and utilisation or destruction in underground, hard rock, precious and base metal mines ...
CCL143 The Capture and Utilisation of Methane at the GFI Mining South Africa owned Beatrix Mine in South Africa 4728 01/03/2011 – 30/06/2011
South Africa

AM0064: Methodology for methane capture and utilization or destruction in underground, hard rock, precious and base metal mines (Version 02).; Sectoral Scope 10

...
CCL155 Lawley Fuel Switch Project 0177 01/01/2007 – 31/12/2011
South Africa

AM0008: ‘Industrial fuel switching from coal and petroleum fuels to natural gas without extension of capacity and lifetime of the facility’, (Version 01).; Sectoral Scope 4

...
CCL177 Improved Cook Stoves for East Africa (ICSEA)

7014

15/92012

14/03 2013
Burundi, Kenya, Lesotho, Rwanda, South Africa, Uganda

AMS II: “Energy Efficiency Measures in Thermal Applications of Non-
Renewable Biomass”,  version 3 , - Sectoral Scope 03

...
CCL203 3.66 MW poultry litter based power generation project by Raus Power in India

2348

25/01/2010 31/12/2012
India

AMS-I.D. ver. 13 - Grid connected renewable electricity generation, Scope 1 AMS-III.E. ver. 15 - Avoidance of methane production from decay of biomass through controlled combustion, gasification or mechanical/thermal treatment, Scope 13

...
CCL250 Improving Energy Efficiency in Railways‟ Residential Quarters – Western Region 3811 01/01/2013 - 31/12/2013
India
AMS-II.J. “Demand-side activities for efficient lighting technologies” Version 3.0 ,  Sectoral Scope 03  
CCL257 A01 Abohar Branch Canal Based Small Hydro Power Project in Punjab, India 4856 01/12/2012 -
31/03/2014

India

AMS I.D. “Grid connected renewable electricity generation” Version 16 ,  Sectoral Scope 01

 
CCL257 A02 Dolowal, Salar and Bhanubhura Mini Hydroelectric Projects 0328 01/11/2012 -
25/04/2013

India
AMS I.D. “Grid connected renewable electricity generation” Version 07 ,  Sectoral Scope 01  
CCL257 A03 Babanpur, Killa and Sahoke Mini Hydroelectric Projects 0329 01/11/2012 - 28/02/2014
India
AMS-II.J. “Demand-side activities for efficient lighting technologies” Version 3.0 ,  Sectoral Scope 03  

Projects under validation
1 http://cdm.unfccc.int/Issuance/MonitoringReports/index.htm

Projects for which issuance was requested
1 http://cdm.unfccc.int/Issuance/cers_iss.html